|
(air movers not placed yet) |
When performing in-place drying, more air-movers are needed for fast evaporation.
- In a class 2 or class 3 water loss, air movers are placed every 10'-16' along the wall. ( if you use metric 3-4 m) along the wall.
- Air movers are directed toward the wall at a 15° to 45° angle, depending upon the type of air mover.
- The air mover snout will almost touch the wall, which means within 1" (again, if you are metric- 2.5 cm ) of the wall but not rubbing it.
All air movers ins each area will face the same direction, whether clockwise or counter-clockwise, to ensure that air movers are not pushing against each other
ServiceMaster of Salt Lake 801-506-0027 call now. Service all along the Wasatch Front. And, Yes we can come to Summit and Wasatch Counties call for details
No comments:
Post a Comment