Large amount of water, absorption, and evaporation.
Water losses that affect the majority of a room of carpet and cushion (pad). Water has wicked up walls less than 24 inches. There is moisture in structural materials.
This class includes more water remaining after extraction than class 1 and includes some moisture wicking up the walls. Since porous materials are affected and absorption happens rapidly, the volume of moisture that will be dealt with must be considered. These items will also release their moisture rapidly, therefore more dehumidification is required to prevent secondary damages.
No comments:
Post a Comment